INDUSTRIA VIDRIERA DE COAHUILA
Participation in construction and maintenance of the furnace 1
- Ambient water pipe
- Natural gas pipeline
- Air pipe
- Drainage pipe
- Assembly of pumps
- Installation of fire network
- Maintenance to service lines
Participation in construction and maintenance of furnaces 2, 3 and 4
- Assembly of bottle forming machines
- Ambient water pipe
- Natural gas pipeline
- Air pipe
- Drainage pipe
- Assembly of pumps
- Installation of fire network
- Maintenance to service lines